Our Projects

Back to projects

 

Electrical Installation

EPE Power Corp. Bhd / Tenaga Nasional Berhad
Project Details:

Underground Cable Project Samsung, Bona Vista No.2, Larkin Floating City, Jln Imbi, and Mid Valley Substation

Main head C -
Item 1: Mid Valley to TNB HQ
Item2: Galloway Substation - Jln Imbi Substation

Project Period:

1997 - 2000

 

Status:

Completed

Tenaga Nasional Berhad
Project Details:
Supply & Installation of 132kV 1C XLPE 800sq.mm.cu 220 meter lenght inclusive of two units' outdoor type 132kV sealing end for PMU 275/132/66/22kV Papan
Project Period:

2002 - 2002

Status:

Completed

Project Details:

Supply & Installation of 132kV Switchgear, Ancillary Equipment & Accociated Civil Works for Rawang 132kV Switching Substation, Sungkai 132kV Switching Substations & Kalumbang 132kV Extension

Project Period:

2002 - 2006

Status:

Completed

Project Details:

Oil-filled Underground Cable Breakdown KULS-NSPK (Feeder 2) from PMU KL South to Jln Klang Lama

Project Period:

2006 - 2006

Status:

Completed

Project Details:

Cables From PMU Papan Terminal Tower of papan-pangkalan menglembu Lines& Re-Routing 275kV Submarine Power Cables From Existing GIS building to New GIS Building of PMU 275/132kV Bayan Lepas

Project Period:

2006 - 2010

Status:

Completed

Project Details:

Supply, Installation, Testing, Commisioning of Single Circuit 150MVA 132kV XLPE Underground Cable from Gelugor Substation to Sg. PInang Substation

Project Period:

2007 - 2011

Status:

Completed

Project Details:

Repairing, Cable Breakdown 132 kV XLPE KULN-KCPK (Freeder 1) from PMU KL North to Tower Terminal

Project Period:

2007 - 2007

Status:

Completed

Project Details:

Supply, Installation, Testing, Commisioning of 132kV Rehabiliation KTCL - KTNN Diversion Cables Works Project Kuantan Substation

Project Period:

2008 - 2009

Status:

Completed

Project Details:

Bayan Lepas Diversion Works Related to TNB98/2012 as per Scope of Works dated 16.05.2012 Penang Repair Works 275kV Juru Bayan Project

Project Period:

2012 - 2012

Status:

Completed

Tenaga Cable Industries Sdn Bhd
Project Details:
Installation, Testing and Commissioning of Two Circuit 132kV XLPE underground Cables Between PMU Prai Tower
Project Period:

2002 - 2002

Status:

Completed

TNB Engineering Corporation Sdn Bhd
Project Details:

Resifting work for 132kV Underground Cable Between PMU/KTAN9N/KTCL L1 & L2 at Jalan Bukit Sekilau, Kuantan

Project Period:

2002 - 2002

 

Status:

Completed

Voith Siemens Hydro
Project Details:

Cameron Highlands - Batang Padang Hydroelectric Schemes Life Extension

Project Period:

2003 - 2008

 

Status:

Completed

Tenaga Cable Industries Sdn Bhd
Project Details:

Supply, Delivery, Installation, Testing and Commissioning of 132kV XLPE Underground Cables (Reconfiguration) at Tampoi Industrial Park Substation, Johor Darul Takzim

Project Period:

2006 - 2010

 

Status:

Completed

REMT Utama Sdn Bhd
Project Details:
Proposed Design & Build for Project Transmision Line 132kV from Segaliud to Sapi Nengoh and PMU 2x30MVA 132/33kV, Sapi nangoh, Sabah under Programme (BELB).
Project Period:

2012 - 2017

 

Status:

Completed

Nur Power Sdn Bhd
Project Details:
Cable Supply and Installation of West 132kV Substation Project
Project Period:
2015 - 2016
Status:

Completed

Bumisem Engineering Sdn Bhd
Project Details:

Proposed Design & Build for Project Rural Area (BELB) Sabah Year 2016-2017 under Zone 1 (Kuala Penyu, Beufort, Keningau, Penampang, Kota Kinabalu, Sipitang, Tambunan)

Project Period:

2016 - 2018

Status:

Completed